CTO · manufacturing group · Mumbai
IN·CTO₹49L
downtime cost avoided
The Emergency: Production ECC hung with every work process in PRIV mode and login blocked.
What happened: Booked QuickHire and a PM assigned a Basis admin within 10 minutes.
Result: Memory parameters in RZ10 corrected and stuck processes cleared mid-shift.











