CTO · manufacturing group · Pune
IN·CTO−87%
batch runtime reduced
The Emergency: A month-end batch posting job overran and blocked the financial close.
What happened: Booked QuickHire and a PM assigned an ABAP on HANA developer within 10 minutes.
Result: Loops rewritten as CDS pushdown and the close ran on schedule again.











