Skip to main content
QuickHire

Notifications

You're all caught up

New updates, payments, and messages will land here as soon as they arrive.

Enterprise SAP Consulting

SAP Data Migration Services - Legacy ERP to HANA and RISE

We design and execute end-to-end SAP migration programs that move organizations from legacy ERP landscapes and third-party databases to SAP S/4HANA, SAP HANA, and SAP RISE - with rigorous data quality assurance, structured parallel run validation, and zero-surprise cutovers engineered around your operational constraints.

ISO 27001SOC 2 ReadyNDA Day 1MSA AvailableIP Protection

Get Matched in 10 Minutes

Fill in the details PM calls you back to confirm.

No spam. PM calls within 10 minutes during business hours.

500+
Enterprise Clients
10,000+
Engineers Deployed
50+
Countries Served
99.4%
CSAT Score
48h
Team Assembly

The Challenge

Legacy SAP Landscapes Create Compounding Technical and Business Risk

Organizations running SAP ECC on aging AnyDB platforms or operating decades-old ERP configurations face accelerating maintenance costs, shrinking vendor support windows, and an inability to leverage modern SAP capabilities such as embedded analytics, real-time inventory, and intelligent automation. Deferred migration decisions do not reduce risk - they concentrate it, accumulating technical debt, integration fragility, and data quality degradation that make each subsequent migration cycle more complex and expensive.

40%
of SAP ECC customers still on unsupported AnyDB platforms
3x
higher remediation cost when migration is deferred beyond end of maintenance
$2.4M
average cost of a failed or aborted SAP migration cutover
68%
of SAP programs exceed timeline due to data quality failures

Why QuickHire

Why Enterprises Choose QuickHire

01

Methodology-Driven Delivery

Every engagement follows the SAP Activate methodology with formal phase gates and documented deliverables at each milestone. Our consultants hold active SAP certification across Finance, Logistics, and Technology Architecture domains.

02

Data Quality as a First-Class Workstream

We treat data quality as a parallel program workstream, not an afterthought. Early profiling, iterative cleansing cycles, and stakeholder sign-off gates prevent data issues from surfacing during cutover.

03

ETL Engineering at Enterprise Scale

Our data engineers design high-throughput extraction pipelines using SAP BODS, SLT, and certified third-party tools to handle multi-terabyte migration volumes within defined cutover windows.

04

SAP RISE and Cloud Migration Expertise

We hold SAP RISE Partner Program membership and have executed on-premises-to-RISE transitions covering infrastructure exit planning, network topology redesign, and RISE commercial negotiation support.

05

Cutover Runbook Precision

Our cutover runbooks are task-level operational documents rehearsed in full mock cutovers before production execution, with clear go/no-go criteria and tested rollback procedures at every major checkpoint.

06

Parallel Run and Reconciliation Frameworks

We operate structured parallel run programs spanning one to two financial periods, with automated reconciliation reporting across GL balances, open items, and logistics documents to validate migration fidelity before decommissioning legacy systems.

Challenges

Common Enterprise Pain Points

01

Data Debt Accumulated Over Decades

Legacy ERP systems frequently contain 10 to 20 years of master data duplicates, obsolete records, and inconsistent coding conventions that must be resolved before loading into SAP. Without a systematic data quality program, these issues surface as production errors during cutover and erode business trust in the new system.

02

Undocumented Custom Code and Enhancements

Most long-running SAP ECC landscapes contain hundreds or thousands of custom ABAP objects, user exits, and BADIs that require compatibility assessment against S/4HANA simplification items. Unresolved custom code conflicts are a leading cause of migration project scope expansion and timeline overruns.

03

Integration Landscape Complexity

SAP systems at enterprise scale are rarely standalone - they are connected to dozens of adjacent systems through IDocs, BAPIs, RFC calls, and middleware platforms. Each interface must be inventoried, assessed, and retested in the target landscape, adding substantial scope to the migration program.

04

Cutover Window Constraints

Many organizations operate 24/7 and cannot tolerate extended system downtime for migration cutover. Compressing the cutover window requires extensive optimization of data loading pipelines, pre-cutover pre-processing, and rehearsed execution teams operating across time zones.

05

Organizational Change and User Readiness

SAP S/4HANA introduces simplified data models, new Fiori-based user interfaces, and changed business processes that require structured training and change management programs running in parallel with the technical migration workstream. Underinvestment in change management is a consistently cited factor in post-go-live productivity loss.

Our Approach

A Structured SAP Migration Program Built Around Your Data, Your Processes, and Your Cutover Window

Our SAP migration framework integrates data quality assessment, ETL engineering, functional configuration, custom code remediation, and cutover management into a single coordinated program with clear accountability at every workstream. We design the migration architecture around your specific landscape - whether AnyDB to HANA, ECC to S/4HANA brownfield conversion, greenfield reimplementation, or on-premises to SAP RISE - and engineer delivery timelines and go-live strategies that match your operational and financial calendar.

01
Migration Approach Selection
We conduct a structured assessment to determine the optimal migration path - greenfield, brownfield, or selective data transition - based on your process maturity, technical debt profile, and strategic objectives.
02
Data Quality and Governance
A dedicated data workstream runs profiling, cleansing, and business sign-off cycles across all migration objects, with quality scorecards and acceptance thresholds defined before the first mock migration load.
03
ETL Architecture and Tooling
We design and build extraction, transformation, and loading pipelines using SAP-native and certified third-party tools, optimized for the data volumes and cutover window constraints specific to your landscape.
04
Cutover and Parallel Run Management
Full cutover runbook development, mock cutover rehearsals, parallel run reconciliation frameworks, and hypercare support ensure a controlled, validated transition from legacy to target system.

Delivery Models

How We Deliver

Scoping and Readiness Assessment

A time-boxed engagement to assess migration complexity, data quality baseline, custom code volume, and integration landscape, producing a migration approach recommendation and indicative program plan.

Timeline
4-6 weeks
Team Size
3-5 consultants
Full Migration Program Delivery

End-to-end program delivery from Prepare through Hypercare, with dedicated functional, technical, and data migration workstreams operating under a single program governance structure.

Timeline
12-24 months
Team Size
8-20 consultants
Migration Factory - Wave-Based Rollout

Structured delivery of multi-country or multi-business-unit SAP rollouts using a template-and-deploy model, with each wave benefiting from accelerated timelines through reuse of validated configurations and data migration objects.

Timeline
6-12 months per wave
Team Size
6-15 consultants

Capabilities

Technical Capability Matrix

Migration Approaches
Greenfield S/4HANA ImplementationBrownfield System ConversionSelective Data TransitionBluefield MigrationSAP RISE Cloud Migration
Data Migration Tooling
SAP Migration Cockpit (LTMC)SAP BODSSLT Replication ServerSAP HANA Data ProvisioningCustom ABAP Migration Programs
Functional Workstreams
FI/CO Financial MigrationMM/PP Logistics Data MigrationSD Order and Customer DataAsset Accounting MigrationHR/HCM Data Transfer
Technical Workstreams
AnyDB to HANA Database MigrationCustom Code RemediationInterface and Integration RetestingSAP Basis and HANA AdministrationDMO with SUM Execution

Engagement Models

How We Engage

Choose the model that fits your programme governance, budget cycle, and team structure.

01

Staff Augmentation

Engineers embed directly under your management.

Learn more
02

Dedicated Developers

Full-time team aligned to your product roadmap.

Learn more
03

Managed Teams

End-to-end delivery with SLA-backed outcomes.

Learn more
04

Engineering Pods

Autonomous cross-functional pods per domain.

Learn more
05

Offshore Dev Centre

Permanent engineering base in India. Full IP ownership.

Learn more
06

Build-Operate-Transfer

We build and run it. You take ownership on schedule.

Learn more

Our Process

From Discovery to Delivery

1

Discovery and Landscape Assessment

Week 1-2

We conduct technical scoping of the source landscape including system inventory, custom object volume, interface map, and data volume analysis to establish migration complexity and risk profile.

2

Data Profiling and Quality Baseline

Weeks 2-5

Source data is extracted and profiled across all migration-relevant objects, producing a data quality scorecard and prioritized remediation backlog agreed with business stakeholders.

3

ETL Design and Migration Architecture

Weeks 4-10

Migration tooling is selected and configured, transformation rules are documented, and the staging environment is built and validated with initial trial loads of representative data volumes.

4

Iterative Mock Migrations and Cutover Rehearsals

Months 3-8

Multiple full mock migration cycles are executed with progressively improved data quality, culminating in full cutover rehearsals that validate runbook timings and confirm the go-live window is achievable.

5

Production Cutover and Hypercare

Go-live + 8 weeks

The production cutover is executed according to the rehearsed runbook, followed by 4 to 8 weeks of structured hypercare with dedicated support across functional, technical, and data workstreams.

Free Scoping Call

Not ready to book? Our PM calls back.

Tell us what's broken. We'll scope it for free and confirm the right expert no commitment.

PM available now

Get a fix plan
in 10 minutes.

No sales call. A real PM scopes your problem, recommends the right expert, and gives you the plan only book if it fits.

  • Free scoping call PM explains exactly how we fix it
  • No commitment hear the plan before you pay anything
  • Expert confirmed right skill match for your stack
R
P
A

47 PMs responded today

Get Matched in 10 Minutes

Fill in the details PM calls you back to confirm.

No spam. PM calls within 10 minutes during business hours.

Security & Compliance

Enterprise-Grade Security by Default

ISO 27001 CertifiedSOC 2 Type II ReadyGDPR CompliantDPDP Act ReadyNDA on Day 1MSA AvailableIP Assignment ClausesEscrow Options

Governance

Programme Governance

Weekly Steering Committee Reporting

Program status, risk register updates, data quality metrics, and budget burn are reported weekly to a senior stakeholder steering committee with documented decision rights and escalation paths.

Data Quality Acceptance Gates

Formal acceptance gates at each migration milestone require business stakeholder sign-off on data quality scorecards before proceeding to the next phase, preventing quality issues from propagating forward.

Change Control and Scope Management

All scope changes are processed through a formal change control board with documented impact assessment on timeline, budget, and risk, preventing uncontrolled scope expansion.

Go/No-Go Decision Framework

A structured go/no-go checklist covering system performance, data quality thresholds, interface test completion, user readiness, and fallback readiness is reviewed and approved by all workstream leads before production cutover authorization.

Team Structure

Your Enterprise Team

Our SAP migration teams are composed of experienced consultants who have delivered migrations across multiple industries and SAP module landscapes. Each team combines functional domain expertise with deep technical migration skills, structured under a dedicated program manager who maintains cross-workstream coordination and executive communication throughout the engagement.

SAP Program Manager
S/4HANA Functional Lead (FI/CO)
S/4HANA Functional Lead (Logistics)
Data Migration Architect
ABAP / Custom Code Developer
SAP Basis and HANA Administrator
Integration and Interface Consultant
Change Management and Training Lead

Project Lifecycle

From Kickoff to Production

01
4-8 weeks

Discover and Prepare

Migration approach recommendation, project charter, system landscape documentation, initial data quality baseline, and program plan with resource model.

02
6-12 weeks

Explore and Design

Fit-gap analysis, data migration object catalogue, ETL design specifications, integration assessment report, and custom code remediation plan.

03
12-24 weeks

Realize

Configured target system, data migration pipelines built and tested, interfaces retested, mock migration cycles completed, and cutover runbook drafted.

04
4-6 weeks

Deploy and Cutover

Cutover rehearsals completed, production cutover executed, go-live achieved, and legacy system frozen or decommissioned per agreed schedule.

05
Ongoing (4-8 weeks structured)

Run and Hypercare

Incident resolution, data correction support, period-close validation, knowledge transfer documentation, and transition to steady-state AMS or internal support model.

Case Studies

Enterprise Outcomes

Consumer Goods Manufacturing

A global FMCG manufacturer needed to migrate 15 years of SAP ECC data from Oracle DB to S/4HANA HANA across 6 countries.

We deployed a DMO-based migration with SAP BODS pipelines handling 4TB of historical data and completed three full mock migrations before a 56-hour production cutover window.

99.6%data accuracy on go-live with zero critical production incidents in hypercare
Pharmaceutical Distribution

A pharmaceutical distributor's on-premises SAP ECC system required migration to SAP RISE to meet a board-mandated data center exit deadline.

We executed a brownfield system conversion to S/4HANA Cloud Private Edition on RISE, with BTP Integration Suite reconfiguration for 28 EDI and API interfaces.

$1.8Mannual infrastructure cost reduction achieved post-RISE transition
Industrial Equipment

A heavy equipment manufacturer with heavily customized SAP PP/MM needed a selective data transition to preserve operational history while adopting standard S/4HANA processes.

We delivered a bluefield migration using SAP Selective Data Transition tooling, migrating 8 years of production orders and inventory history while re-implementing procurement on standard best-practice processes.

4ximprovement in MRP run performance on HANA vs. legacy Oracle database

Start Your Engagement

Ready to Build Your Enterprise Engineering Team?

Speak with a solution architect. We scope your engagement together. No sales pressure, no commitment required.

Hiring Models

One platform, two ways to hire

Not ready for a long-term commitment? QuickHire Instant lets you book a vetted engineer in 10 minutes - no contracts required.

Both models use the same vetted talent network · PM always included · Multi-country billing

Frequently Asked Questions

A greenfield approach involves implementing a brand-new SAP S/4HANA system from scratch, migrating only cleansed, relevant data from legacy systems without carrying forward historical configurations. A brownfield approach, also called a system conversion, upgrades and converts the existing SAP ECC system in place, preserving historical data, customizations, and process configurations. The choice depends on your organization's appetite for process re-engineering, the volume of technical debt in the legacy system, and the strategic value of retaining historical transactional data. A bluefield or selective data transition blends both, allowing you to selectively migrate specific business units or datasets while adopting new best-practice processes.
AnyDB to HANA migration involves moving SAP workloads running on third-party databases such as Oracle, IBM DB2, Microsoft SQL Server, or MaxDB onto the SAP HANA in-memory database platform. Preparation begins with a technical assessment using tools like SAP Readiness Check and the Database Migration Option (DMO) of the Software Update Manager (SUM), which combines the database migration and SAP upgrade in a single step. Data volume management activities - including archiving obsolete records, table partitioning, and nearline storage configuration - are critical to reducing migration downtime and optimizing post-migration HANA performance. Sizing exercises using HANA hardware sizing reports must be completed before infrastructure provisioning to ensure the target HANA environment meets memory and CPU requirements.
SAP Migration Cockpit (LTMC/LTMOM) is the modern, recommended data migration tool for SAP S/4HANA, providing pre-built migration objects for standard business data such as customers, vendors, materials, open items, and financial balances. Unlike Legacy System Migration Workbench (LSMW) or custom BAPI programs, Migration Cockpit offers a guided, template-based approach with built-in data mapping, simulation runs, and error reporting within the SAP Fiori interface. It enforces data integrity through staging tables and business validations before committing records to the production database, significantly reducing the risk of corrupted master or transactional data. For complex or non-standard data objects, Migration Cockpit can be extended using custom migration objects defined through the Migration Object Modeler.
A mid-size enterprise SAP S/4HANA migration typically spans 12 to 24 months from initial scoping through hypercare stabilization, though timelines vary significantly based on the migration approach, system complexity, and organizational readiness. The preparation and fit-gap analysis phase alone can take 2 to 4 months, while data extraction, cleansing, and loading cycles commonly consume 3 to 6 months of iterative effort. Parallel run periods - where legacy and new systems operate simultaneously to validate data accuracy - generally add 4 to 8 weeks before go-live cutover. Phased rollouts by geography or business unit can extend the total program timeline but reduce per-cutover risk and allow lessons learned to be applied progressively.
A rigorous data quality assessment begins with data profiling across all source systems to identify duplicates, missing mandatory fields, broken referential integrity, and inconsistent coding conventions. Business rules are then defined collaboratively with process owners to govern what constitutes valid, complete, and accurate records for each data object such as customer master, chart of accounts, and open purchase orders. Deduplication, standardization, and enrichment exercises are performed iteratively in the staging environment, with quality scorecards tracking improvement across each migration load cycle. A final data sign-off gate is held with business stakeholders before any production load to confirm that data quality thresholds - typically 98% or higher accuracy for financial objects - have been met.
SAP RISE (Reliable, Instant, Scalable Enterprise) is SAP's managed cloud subscription offering that bundles SAP S/4HANA Cloud Private Edition, HANA Enterprise Cloud infrastructure, SAP Business Technology Platform entitlements, and premium support into a single contract. Migrating on-premises SAP to RISE is not a simple infrastructure lift-and-shift; it requires a technical system conversion or new implementation aligned to the RISE deployment topology, network integration design, and data center exit planning. Customers must also negotiate the commercial transition from perpetual licenses to RISE subscription pricing, and address data residency, compliance, and connectivity requirements with SAP. The RISE migration methodology includes SAP-led technical enablement workshops, infrastructure sizing, and a defined hypercare period managed jointly by the customer, implementation partner, and SAP.
A parallel run strategy involves operating both the legacy system and the new SAP environment simultaneously for a defined period - typically one to two accounting periods - processing real business transactions in both systems and reconciling outputs to validate data integrity and process correctness. For financial data migration specifically, parallel runs verify that general ledger balances, accounts receivable and payable aging, asset net book values, and cost center allocations match between systems within acceptable tolerance thresholds. Discrepancies identified during the parallel run trigger root cause analysis and corrective data adjustments before legacy system decommissioning, dramatically reducing the risk of financial reporting errors post-go-live. The parallel run strategy also builds business user confidence, satisfies audit requirements, and provides a validated fallback position if the cutover must be aborted.
ETL (Extract, Transform, Load) design for large-volume SAP migrations begins with mapping source system fields to SAP target data structures, defining transformation rules for unit of measure conversions, currency normalization, organizational unit mapping, and custom field extensions. High-volume objects such as material ledger documents, FI line items, and logistics execution records are typically handled through direct database extraction using tools like SLT (SAP Landscape Transformation Replication Server), BODS (SAP Business Objects Data Services), or third-party platforms such as Informatica or Talend. Incremental extraction strategies are designed to minimize delta volumes during cutover, capturing only changes made after the initial historical load. Performance tuning including parallel job streams, bulk insert optimization, and HANA-native loading via the HANA Data Provisioning framework ensures multi-terabyte loads complete within defined cutover windows.
The most frequent risks include data quality failures discovered late in the project, scope creep from undocumented customizations, cutover window overruns, and insufficient business user readiness. Data risk is mitigated through early and repeated mock migration cycles - ideally three or more full dress rehearsals - with improving quality metrics tracked against defined acceptance criteria. Customization risk is addressed through comprehensive ABAP custom code scoping using the SAP Custom Code Migration App, identifying objects requiring remediation before the system conversion begins. Cutover window risk is managed by developing a detailed minute-by-minute cutover runbook, rehearsing the full sequence in mock runs, and establishing a clear go/no-go decision framework with rollback procedures. Business readiness risk requires a structured change management and training program running in parallel with the technical migration workstream.
A qualified SAP migration partner should hold active SAP Partner Center of Expertise (PCoE) certification, which validates quality standards in implementation methodology, support processes, and customer satisfaction. Individual consultants delivering S/4HANA migration projects should carry SAP Certified Application Associate or Professional credentials for the relevant functional areas such as SAP S/4HANA Finance, Logistics, or Supply Chain. Partners engaged for RISE migrations should additionally hold SAP RISE Partner Program membership, demonstrating alignment with SAP's cloud migration standards and access to SAP-internal escalation paths. Experience with the SAP Activate methodology - including proven completion of projects using Discover, Prepare, Explore, Realize, Deploy, and Run phases - is a baseline expectation for any enterprise-scale engagement.
SAP migration projects are typically priced on a time-and-materials basis for complex, undefined-scope engagements, or as fixed-price contracts for well-scoped, template-driven migrations with clearly bounded data objects and source systems. Hybrid models are common, with the data quality assessment and fit-gap phases on time-and-materials, transitioning to a fixed-price realization phase once scope is confirmed. Dedicated team models - where a blended team of functional consultants, ABAP developers, and data engineers is embedded with the client - suit programs requiring sustained 12 to 24 month delivery capacity. Managed migration services, where the partner takes end-to-end accountability including post-go-live hypercare, are increasingly preferred by organizations seeking to minimize internal resource commitment and program management overhead.
Historical data that does not meet quality thresholds or falls outside the agreed data migration scope is typically handled through one of three strategies: nearline storage, data archiving, or retention in a decommissioned system read-only layer. SAP ILM (Information Lifecycle Management) and certified nearline storage partners such as PBS or Informatica Archive enable archived SAP data to remain accessible from within the new SAP environment through standard reporting transactions, preserving audit trails and regulatory compliance without inflating the production database. For non-SAP legacy data, a data lake or enterprise data warehouse can serve as a long-term retention environment with structured access controls. Data retention decisions must be aligned to legal hold requirements, industry regulations such as GDPR or HIPAA, and tax authority documentation periods, which vary by country and can range from 7 to 10 years.
SAP Basis - the technology platform administration layer - is responsible for system landscape design, transport management, kernel and support package application, database administration, and performance monitoring throughout the migration project. During the migration program, Basis consultants configure the system refresh cycles that replicate the production environment into quality assurance and migration test systems, manage the Software Update Manager (SUM) tool execution for system conversions, and optimize HANA database parameters for migration load performance. The Basis team must be involved from the earliest infrastructure sizing and cloud architecture decisions through to go-live cutover and hypercare, as system availability and performance issues during migration runs directly impact overall program timelines. A typical migration team includes two to four dedicated Basis resources for a mid-to-large enterprise program, working alongside functional consultants and the data migration workstream.
Multi-system landscape migrations require a thorough interface inventory covering all inbound and outbound integrations between SAP and connected systems such as CRM, MES, WMS, e-commerce platforms, and banking interfaces. Each interface must be assessed for compatibility with the target SAP version, with integration middleware such as SAP Integration Suite (BTP), MuleSoft, or Dell Boomi often requiring reconfiguration or repointing. A phased migration sequencing plan must account for system dependencies - for example, migrating SAP EWM before SAP TM could break transportation-warehouse integration - requiring careful orchestration across workstreams. Regression testing of all interfaces using production-representative data volumes is mandatory before each migration milestone, and a dedicated integration testing environment that mirrors the production landscape should be maintained throughout the program.
Cutover planning is the detailed operational process of transitioning from the legacy system to the new SAP environment with minimal business disruption, typically executed over a defined weekend or extended shutdown window. The cutover runbook documents every task in chronological sequence, including task owner, estimated duration, predecessor dependencies, completion criteria, and escalation contacts, with tasks typically numbered and tracked in a shared project management tool during execution. Key milestones in the runbook include legacy system freeze, final delta data extraction, production load execution, interface reconnection, smoke testing of critical business processes, user acceptance sign-off, and formal go-live declaration. Mock cutover rehearsals - ideally two or three full rehearsals with progressively refined timing - are conducted in the weeks before go-live to validate runbook accuracy and identify bottlenecks that could cause the production cutover to overrun its window.
Post-migration hypercare is a structured, time-bound support period - typically 4 to 8 weeks after go-live - during which the full migration and implementation team remains available to resolve production issues, address data discrepancies, and stabilize business processes in the new SAP environment. Hypercare support is tiered, with Tier 1 covering end-user functional questions, Tier 2 addressing configuration and data corrections, and Tier 3 handling ABAP defect resolution and Basis-level system incidents. Daily stand-up calls between the support team and business process owners track open issues, prioritize resolution by business impact, and confirm that critical month-end and period-close processes execute correctly in the new system. Transition to steady-state Application Management Services (AMS) occurs at the end of hypercare, with full knowledge transfer documentation delivered to the client's internal SAP team or the designated AMS provider.
Industries
ManufacturingConsumer GoodsLife SciencesOil and GasFinancial Services